The restored sunroom, with heart-pine floors and the original stone column
The Restoration

Bringing It Back to Life

In 2024, current owners Michael and Bridey Mast took on a top-to-bottom restoration of the estate, carrying the work into 2025.

Check Availability

Once the crown jewel of the Gulf Coast, the estate had fallen into disrepair under previous ownership by the time Michael and Bridey took it on. Extreme termite damage destroyed much of the floor and foundation support in the main foyer, master bedroom, and bathroom and meant gutting those rooms down to the joists or full structure replacement before anything could be rebuilt. The restoration was meticulous and painstaking by design — period-correct furniture and fixtures throughout, so the house reads true to its history rather than staged for it. Most everything that could be painted was, but not everything: the heart pine that runs through most of the house was left intact, because it deserved to be seen, not covered. The goal throughout was to celebrate every season of the home's long history while beginning a new one. What follows is some of that work, from the gut to the reveal.

The Foyer, Start to Finish

One room, from the gut to the finished floor — the entry foyer built around the home's original indoor well.

The very start — walls and floor stripped away, the well's brick pier and the old porch posts all that remained.
The very start — walls and floor stripped away, the well's brick pier and the old porch posts all that remained.
Floor planking removed to expose the damaged joists around the well.
Floor planking removed to expose the damaged joists around the well.
All that remains are the primary floor beams, awaiting clean up and new floor joists. Here the original brick of the well can be seen.
All that remains are the primary floor beams, awaiting clean up and new floor joists. Here the original brick of the well can be seen.
The end walls were destroyed as well. Here the windows and door can be seen hanging freely. Only one pane of glass was lost in the process.
The end walls were destroyed as well. Here the windows and door can be seen hanging freely. Only one pane of glass was lost in the process.
Primary support reduced to one beam, with the other being repurposed to rebuild the east end wall support. New floor joists can be seen here surrounding the well.
Primary support reduced to one beam, with the other being repurposed to rebuild the east end wall support. New floor joists can be seen here surrounding the well.
Once floor support was in place the end wall could be rebuilt.
Once floor support was in place the end wall could be rebuilt.
New beams set, opening up the space for the first time in over 100 years.
New beams set, opening up the space for the first time in over 100 years.
New flooring in place, the beautiful new beams supporting the two original porch roofs.
New flooring in place, the beautiful new beams supporting the two original porch roofs.
Room by Room

The rest of the estate, mid-restoration — termite damage repaired in the foyer and bathrooms, floors refinished, the pool's mechanical systems rebuilt, and the name put back on the gate.

The Magnolia Suite bedroom gutted to the joists, fixtures parked wherever there was floor left to hold them.
The Magnolia Suite bedroom gutted to the joists, fixtures parked wherever there was floor left to hold them.
New flooring and built-ins in, Magnolia mid-way through its renovation.
New flooring and built-ins in, Magnolia mid-way through its renovation.
Bathroom — termite damage meant stripping it to the joists, removing tub and installing new tile floor and shower.
Bathroom — termite damage meant stripping it to the joists, removing tub and installing new tile floor and shower.
Tub — ready for removal.
Tub — ready for removal.
An exterior wall opened up for new framing and insulation.
An exterior wall opened up for new framing and insulation.
New framing for the shower going in, the exterior wall opened up before the siding could go back on.
New framing for the shower going in, the exterior wall opened up before the siding could go back on.
The crew reframing an exterior wall.
The crew reframing an exterior wall.
New framing and plumbing rough-in for one of the bathrooms.
New framing and plumbing rough-in for one of the bathrooms.
Cement board up around the new shower pan, ready for tile.
Cement board up around the new shower pan, ready for tile.
A shower stall mid-tile.
A shower stall mid-tile.
New tile in bath and walk-in closet.
New tile in bath and walk-in closet.
The pool before — failed pump and blown filter.
The pool before — failed pump and blown filter.
Pool lighting, pulled for a full mechanical rebuild.
Pool lighting, pulled for a full mechanical rebuild.
Termite-damaged flooring and blown pool filter, hauled out during demo. This dumpster was filled four times.
Termite-damaged flooring and blown pool filter, hauled out during demo. This dumpster was filled four times.
The old deck out back, worn down and overgrown before any work began.
The old deck out back, worn down and overgrown before any work began.
Deck boards pulled up to get at the damaged joists underneath.
Deck boards pulled up to get at the damaged joists underneath.
The site cleared and pressure-washed, ready to rebuild. Rotting bamboo removed from the wrought iron fence.
The site cleared and pressure-washed, ready to rebuild. Rotting bamboo removed from the wrought iron fence.
The new deck and storage doors built, still raw before paint.
The new deck and storage doors built, still raw before paint.
The finished deck and pool bath house, painted and ready for guests.
The finished deck and pool bath house, painted and ready for guests.
Heart-pine flooring, pulled up and set aside to be repurposed rather than replaced.
Heart-pine flooring, pulled up and set aside to be repurposed rather than replaced.
Refinishing the original heart pine, board by board — too beautiful to paint over.
Refinishing the original heart pine, board by board — too beautiful to paint over.
Sawdust on the garage floor — the flooring work in full swing.
Sawdust on the garage floor — the flooring work in full swing.
New tile going into the laundry.
New tile going into the laundry.
Stiglets' Hideaway bedroom renovation — pulled up ugly carpet, replaced with luxury vinyl tile.
Stiglets' Hideaway bedroom renovation — pulled up ugly carpet, replaced with luxury vinyl tile.
Unsightly bathroom, poor floorplan, mid-demolition.
Unsightly bathroom, poor floorplan, mid-demolition.
Same bathroom, post-demolition.
Same bathroom, post-demolition.
The new shower framed in, with plumbing rough-in for the reworked floorplan.
The new shower framed in, with plumbing rough-in for the reworked floorplan.
New shower ready for tile.
New shower ready for tile.

The work was for moments like these — coffee before everyone else is awake, a conversation that carries on after dinner, a few days when the people you miss are just in the next room. A century-old home, restored board by board, for the stories still to come.

Check Availability